# Botswana Power Corporation (bpc.bw)
> SangTech Sovereign Directory Dossier | Canonical: https://sangtech.dev/directory/company/bpc-bw

## Summary
state-owned company for electrical power generation, transmission and distribution in Botswana

## Edge Telemetry & AI Visibility
- **AI Visibility Score:** 18/100 (Tier 1: Unreachable Origin)
- **Origin Domain:** bpc.bw
- **Jurisdiction:** Gaborone, Botswana (Southern Africa)
- **Sector:** Energy & Industrial Infrastructure
- **Registry Provenance:** CIPA_BOTSWANA_WIKIDATA
- **HTTP Status:** HTTP 404
- **Edge TTFB:** 1088 ms
- **JSON-LD Entity Graph:** Not detected
- **llms.txt Endpoint:** Missing
- **Last Edge Probe:** 2026-11-16T22:11:56Z

## CalcMoney Modeled Pipeline Impact
- **Engine:** Industrial & Energy Infrastructure DCF Valuation Calculator (https://calcmoney.io/calculators/business-valuation)
- **Modeled Monthly Pipeline Leak:** $73 USD
- **Modeled Annual Pipeline Leak:** $876 USD
- **Current AI Retrieval Eligibility:** 12.5% (After AEO fix: 23.5%)
- **$199 AEO Fix Payback:** 82 days

## Self-Healing Edge Log
- No unresolved edge defects persisted for this entity yet. Run live probe via `GET /api/directory-queue?action=probe&domain=bpc.bw`.

## Machine Endpoints
- Free llms.txt Draft: https://sangtech.dev/api/remediate-pack?id=bpc-bw&format=llms
- Live AEO Probe: https://sangtech.dev/api/directory-queue?action=probe&domain=bpc.bw
- Semantic MCP Lookup: https://sangtech.dev/api/mcp?tool=verify_sovereign_entity&domain=bpc.bw
- Durable 25-Prompt Matrix: https://sangtech.dev/api/aeo-matrix?domain=bpc.bw